HLS-SP03
HLS
Availability: | |
---|---|
Quantity: | |
Relying on the BDS high-precision positioning technology and adopting the southern high-precision integrated dual-antenna mode, the base station receives differential correction data to determine and calculate the front and rear antenna coordinates and attitude. And through professional piling software to realize the piling lofting, the measurement and control of the pile core point can reach an accuracy within 3cm.
Relying on the BDS high-precision positioning technology and adopting the southern high-precision integrated dual-antenna mode, the base station receives differential correction data to determine and calculate the front and rear antenna coordinates and attitude. And through professional piling software to realize the piling lofting, the measurement and control of the pile core point can reach an accuracy within 3cm.
1. 7-inch touchable LCD display can save 15,000-20,000 data group;
2. It detects length, fail installation, angle, pressure, time and other parameters during Vertical Wick Drain installation.
3. When the Vertical Wick Drain fail installation, the recorder can record and display the length of the failure and automatically calculate the effective length;
4. The sensor has strong seismic capacity, can adapt to various types of construction machinery, and it can be applicable to any width of Vertical Wick Drain;
5. It can be used for small paper printing or A4-size paper printing at the construction site, and derived data with USB to print.
6. After power off, the data memory can be saved for 5 years; no need to replace the battery;
7. It can apply in AC220V AC or DC19-36V DC.
1. 7-inch touchable LCD display can save 15,000-20,000 data group;
2. It detects length, fail installation, angle, pressure, time and other parameters during Vertical Wick Drain installation.
3. When the Vertical Wick Drain fail installation, the recorder can record and display the length of the failure and automatically calculate the effective length;
4. The sensor has strong seismic capacity, can adapt to various types of construction machinery, and it can be applicable to any width of Vertical Wick Drain;
5. It can be used for small paper printing or A4-size paper printing at the construction site, and derived data with USB to print.
6. After power off, the data memory can be saved for 5 years; no need to replace the battery;
7. It can apply in AC220V AC or DC19-36V DC.
Host: 1.0% accuracy
Depth: 0-99m, accuracy is 0.05% and resolution is 0.01m
Angle: ±30°, 0.5% accuracy, resolution 0.01°
Pressure: 0-500KG, 0.5% accuracy, resolution 1kg
Power supply: AC 220V; DC 19-36V;
Storage: each group of 752 piles, a total of 32 groups
Host: 1.0% accuracy
Depth: 0-99m, accuracy is 0.05% and resolution is 0.01m
Angle: ±30°, 0.5% accuracy, resolution 0.01°
Pressure: 0-500KG, 0.5% accuracy, resolution 1kg
Power supply: AC 220V; DC 19-36V;
Storage: each group of 752 piles, a total of 32 groups
1. Boot interface: recorder connects the power supply, switch on the power, the recorder host interface display
2. Setting interface: click “Settings”, according to the actual situation.
Note: In order to facilitate the observation, click numerical parts on the red box as shown “downlink length”, “release tape speed”, “pressure”, “angle”, set the appropriate maximum value of the actual construction.
1. Boot interface: recorder connects the power supply, switch on the power, the recorder host interface display
2. Setting interface: click “Settings”, according to the actual situation.
Note: In order to facilitate the observation, click numerical parts on the red box as shown “downlink length”, “release tape speed”, “pressure”, “angle”, set the appropriate maximum value of the actual construction.
2024 IRAQ AL FAW PORT PVD CONSTRUCTION WORK
Project Background:The Padma Bridge is the largest project under construction in Bangladesh. The total investment is about 4.4 billion US dollars (about 29.2 billion yuan). The funds are all from Bangladesh ’s own funds; it is also the largest single bridge project undertaken overseas by Chinese com
Overview:NON-SAND VACUUM PRELOADING DRAINAGE METHOD is widely applied to accelerate the soil consolidation, which can apply in large area soft soil foundation treatment, especially to the dredging soil and super soft soil condition, It can greatly saving the construction period, it can replace the s
What is Soft & Weak FoundationSoft & Weak foundation refers to the foundation mainly composed of silt, silty soil, alluvial fill, miscellaneous fill or other highly compressible soil layers. This kind of foundation has high water content, low bearing capacity, poor stability, high compressibility, a
HLS Engineering the Ground Improvement Solution Provider. WE are contributed to provide Design, Construction, Machinery and Material to reinforce the soil.
What is Soft & Weak FoundationSoft & Weak foundation refers to the foundation mainly composed of silt, silty soil, alluvial fill, miscellaneous fill or other highly compressible soil layers. This kind of foundation has high water content, low bearing capacity, poor stability, high compressibility, a
What is Soft & Weak FoundationSoft & Weak foundation refers to the foundation mainly composed of silt, silty soil, alluvial fill, miscellaneous fill or other highly compressible soil layers. This kind of foundation has high water content, low bearing capacity, poor stability, high compressibility, a
What is Soft & Weak FoundationSoft & Weak foundation refers to the foundation mainly composed of silt, silty soil, alluvial fill, miscellaneous fill or other highly compressible soil layers. This kind of foundation has high water content, low bearing capacity, poor stability, high compressibility, a
Overview:Surcharge Preloading Method is widely apply in soft soil improvement projects, and the method will be Site Leveling + Sand Layer + PVD Installation + Drainage Channel Excavation. Performance:◎ Increase Bearing Capacity ◎ Increase Soil Consolidation ◎ Reduce different Settlement after Discha
Project Background:The project of Zhuhai Huihua Experimental School in Guangdong province is located in Pingsha Town, Gaolan Port Economic Zone, Zhuhai City. The project covers a total area of 32,000 square meters, with a total construction area of 37629 square meters, including 4515 square meters r
Project Background:On May 29, 2017, CCECC successfully signed the package 9 of the N8 highway expansion project. The project was obtained through the negotiation of tenders and was the government ’s own funds. The owner was the Bangladesh Army Engineering Office. The main project was the constructio
Project Background:This project is located in Bodu Akali County, Barisal Zone, southern city of Bangladesh, 210 kilometers away from the capital Dhaka and 160 kilometers away from Chittagong. A 2 × 660MW ultra-supercritical coal-fired power generating unit will be built, and the expansion conditions
Project Background:On November 2nd and 27th, 2017, CCCC-SHEC Third Highway Engineering Co., Ltd received the Phase 1 and Phase 2 bid winning notices for the repair and expansion of Highway 32 in Costa Rica. The two bids were merged into the first branch manager department after a study and decision