You are here: Home / News / Technology / SURCHARGE PRELOADING METHOD

SURCHARGE PRELOADING METHOD

Views: 68     Author: Site Editor     Publish Time: 2020-05-27      Origin: Site

企业微信截图_15907386708962


Overview:


Surcharge Preloading Method is widely apply in soft soil improvement projects, and the method will be Site Leveling + Sand Layer + PVD Installation + Drainage Channel Excavation. 



Performance:

◎ Increase Bearing Capacity 

◎ Increase Soil Consolidation 

◎ Reduce different Settlement after Discharge


Application:

◎ Road projects, Railway Projects;

◎ Airport Runway Projects;

◎ Dredging Projects.




Process:

23


Quick Links

Product

Contact

  8620 61918016
  inquiry@hls-eng.com
  No.506, Building 1, Panshan Chaoneng Pioneer Park, No.900, North Panyu Avenue, Panyu, Guangzhou, Guangdong, China.
Copyright © 2023 Guangdong HLS soft Foundation Engineering Co.,Ltd.  All Right Reserve by HLS.