While the Vacuum Pre-loading Method ongoing, the water sill be drainage out from the ground, but at this moment, the water on the ground will be imbalance spread.
The hose with steel wire screwing inland in the hose. It's light, transparent, with small bending radius, which has good adaptability to hard weather conditions and minus pressure.
Performance:
a. This hose is widely used for suction and discharge of water. It's non-toxic,without odor.
b. Food grade hose made of top grade PVC.
c. Anti-static hose, we can also insert the cooper wire into hose, this hose can avoid the block of the flowing in the hose due to static, then protect the user from getting electric shock.
d..Steel wire & fiber double reinforced hose, be made with steel wire and high quality fiber by advanced technology, double reinforcement, can bear 2-3times higher pressure compared with common hose.
Working Temperature:
Normal grade: -5ºC to +65ºC
High temperature resistant grade: -5ºC to +160ºC
Low temperature resistant grade: -40ºC to +65ºC
Application:
Suction and transfer of water;
Oil, powder, granules and light chemicals in full vacuum lines;
Vacuum pump lines, coolant lines, air conditioning systems, air and water supply lines; Washing equipment, and other areas where require tight turns and sharp bends.
While the Vacuum Pre-loading Method ongoing, the water sill be drainage out from the ground, but at this moment, the water on the ground will be imbalance spread.
The hose with steel wire screwing inland in the hose. It's light, transparent, with small bending radius, which has good adaptability to hard weather conditions and minus pressure.
Performance:
a. This hose is widely used for suction and discharge of water. It's non-toxic,without odor.
b. Food grade hose made of top grade PVC.
c. Anti-static hose, we can also insert the cooper wire into hose, this hose can avoid the block of the flowing in the hose due to static, then protect the user from getting electric shock.
d..Steel wire & fiber double reinforced hose, be made with steel wire and high quality fiber by advanced technology, double reinforcement, can bear 2-3times higher pressure compared with common hose.
Working Temperature:
Normal grade: -5ºC to +65ºC
High temperature resistant grade: -5ºC to +160ºC
Low temperature resistant grade: -40ºC to +65ºC
Application:
Suction and transfer of water;
Oil, powder, granules and light chemicals in full vacuum lines;
Vacuum pump lines, coolant lines, air conditioning systems, air and water supply lines; Washing equipment, and other areas where require tight turns and sharp bends.
内径 | 外径 | 重量 | W.P.(at23C) | Std Length | ||||
英寸 | mm | 英寸 | mm | kg/m | bar | psi | m | ft |
1/4 | 6 | 0.433 | 11 | 0.12 | 10 | 145 | 100 | 300 |
5/16 | 8 | 0.551 | 14 | 0.15 | 10 | 145 | 100 | 300 |
3/8 | 10 | 0.629 | 16 | 0.2 | 10 | 145 | 100 | 300 |
1/2 | 12 | 0.708 | 18 | 0.22 | 8 | 120 | 100 | 300 |
5/8 | 15 | 0.866 | 22 | 0.31 | 8 | 120 | 100 | 300 |
3/4 | 19 | 0.984 | 25 | 0.36 | 8 | 120 | 50 | 150 |
1 | 25 | 1.299 | 33 | 0.54 | 8 | 120 | 50 | 150 |
1-1/4 | 32 | 1.614 | 41 | 0.78 | 7 | 100 | 40 | 120 |
1-1/2 | 38 | 1.889 | 48 | 1.05 | 6 | 90 | 40 | 120 |
1-3/4 | 45 | 2.204 | 56 | 1.3 | 6 | 90 | 40 | 120 |
1-7/8 | 48 | 2.322 | 59 | 1.4 | 6 | 90 | 40 | 120 |
2 | 50 | 2.441 | 62 | 1.6 | 5 | 75 | 40 | 120 |
2-1/4 | 58 | 2.755 | 70 | 2 | 5 | 75 | 30 | 90 |
2-1/2 | 63 | 3.149 | 80 | 2.8 | 5 | 75 | 30 | 90 |
3 | 75 | 3.582 | 91 | 3.5 | 4 | 60 | 30 | 90 |
3-1/2 | 90 | 4.251 | 108 | 4.5 | 4 | 60 | 20 | 60 |
4 | 100 | 4.645 | 118 | 4.8 | 3 | 45 | 20 | 60 |
5 | 127 | 5.629 | 143 | 6 | 3 | 45 | 20 | 60 |
6 | 152 | 6.692 | 170 | 9 | 3 | 45 | 10 | 30 |
8 | 200 | 8.818 | 224 | 12 | 3 | 45 | 10 | 30 |
10 | 250 | 10.866 | 276 | 23 | 2 | 30 | 10 | 30 |
内径 | 外径 | 重量 | W.P.(at23C) | Std Length | ||||
英寸 | mm | 英寸 | mm | kg/m | bar | psi | m | ft |
1/4 | 6 | 0.433 | 11 | 0.12 | 10 | 145 | 100 | 300 |
5/16 | 8 | 0.551 | 14 | 0.15 | 10 | 145 | 100 | 300 |
3/8 | 10 | 0.629 | 16 | 0.2 | 10 | 145 | 100 | 300 |
1/2 | 12 | 0.708 | 18 | 0.22 | 8 | 120 | 100 | 300 |
5/8 | 15 | 0.866 | 22 | 0.31 | 8 | 120 | 100 | 300 |
3/4 | 19 | 0.984 | 25 | 0.36 | 8 | 120 | 50 | 150 |
1 | 25 | 1.299 | 33 | 0.54 | 8 | 120 | 50 | 150 |
1-1/4 | 32 | 1.614 | 41 | 0.78 | 7 | 100 | 40 | 120 |
1-1/2 | 38 | 1.889 | 48 | 1.05 | 6 | 90 | 40 | 120 |
1-3/4 | 45 | 2.204 | 56 | 1.3 | 6 | 90 | 40 | 120 |
1-7/8 | 48 | 2.322 | 59 | 1.4 | 6 | 90 | 40 | 120 |
2 | 50 | 2.441 | 62 | 1.6 | 5 | 75 | 40 | 120 |
2-1/4 | 58 | 2.755 | 70 | 2 | 5 | 75 | 30 | 90 |
2-1/2 | 63 | 3.149 | 80 | 2.8 | 5 | 75 | 30 | 90 |
3 | 75 | 3.582 | 91 | 3.5 | 4 | 60 | 30 | 90 |
3-1/2 | 90 | 4.251 | 108 | 4.5 | 4 | 60 | 20 | 60 |
4 | 100 | 4.645 | 118 | 4.8 | 3 | 45 | 20 | 60 |
5 | 127 | 5.629 | 143 | 6 | 3 | 45 | 20 | 60 |
6 | 152 | 6.692 | 170 | 9 | 3 | 45 | 10 | 30 |
8 | 200 | 8.818 | 224 | 12 | 3 | 45 | 10 | 30 |
10 | 250 | 10.866 | 276 | 23 | 2 | 30 | 10 | 30 |
2024 IRAQ AL FAW PORT PVD CONSTRUCTION WORK
Project Background:The Padma Bridge is the largest project under construction in Bangladesh. The total investment is about 4.4 billion US dollars (about 29.2 billion yuan). The funds are all from Bangladesh ’s own funds; it is also the largest single bridge project undertaken overseas by Chinese com
Overview:NON-SAND VACUUM PRELOADING DRAINAGE METHOD is widely applied to accelerate the soil consolidation, which can apply in large area soft soil foundation treatment, especially to the dredging soil and super soft soil condition, It can greatly saving the construction period, it can replace the s
What is Soft & Weak FoundationSoft & Weak foundation refers to the foundation mainly composed of silt, silty soil, alluvial fill, miscellaneous fill or other highly compressible soil layers. This kind of foundation has high water content, low bearing capacity, poor stability, high compressibility, a
HLS Engineering the Ground Improvement Solution Provider. WE are contributed to provide Design, Construction, Machinery and Material to reinforce the soil.
What is Soft & Weak FoundationSoft & Weak foundation refers to the foundation mainly composed of silt, silty soil, alluvial fill, miscellaneous fill or other highly compressible soil layers. This kind of foundation has high water content, low bearing capacity, poor stability, high compressibility, a
What is Soft & Weak FoundationSoft & Weak foundation refers to the foundation mainly composed of silt, silty soil, alluvial fill, miscellaneous fill or other highly compressible soil layers. This kind of foundation has high water content, low bearing capacity, poor stability, high compressibility, a
What is Soft & Weak FoundationSoft & Weak foundation refers to the foundation mainly composed of silt, silty soil, alluvial fill, miscellaneous fill or other highly compressible soil layers. This kind of foundation has high water content, low bearing capacity, poor stability, high compressibility, a
Overview:Surcharge Preloading Method is widely apply in soft soil improvement projects, and the method will be Site Leveling + Sand Layer + PVD Installation + Drainage Channel Excavation. Performance:◎ Increase Bearing Capacity ◎ Increase Soil Consolidation ◎ Reduce different Settlement after Discha
Project Background:The project of Zhuhai Huihua Experimental School in Guangdong province is located in Pingsha Town, Gaolan Port Economic Zone, Zhuhai City. The project covers a total area of 32,000 square meters, with a total construction area of 37629 square meters, including 4515 square meters r
Project Background:On May 29, 2017, CCECC successfully signed the package 9 of the N8 highway expansion project. The project was obtained through the negotiation of tenders and was the government ’s own funds. The owner was the Bangladesh Army Engineering Office. The main project was the constructio
Project Background:This project is located in Bodu Akali County, Barisal Zone, southern city of Bangladesh, 210 kilometers away from the capital Dhaka and 160 kilometers away from Chittagong. A 2 × 660MW ultra-supercritical coal-fired power generating unit will be built, and the expansion conditions
Project Background:On November 2nd and 27th, 2017, CCCC-SHEC Third Highway Engineering Co., Ltd received the Phase 1 and Phase 2 bid winning notices for the repair and expansion of Highway 32 in Costa Rica. The two bids were merged into the first branch manager department after a study and decision