You are here: Home / Products / PVD Mast / PVD Mast / Chain Type / Chain Type Wick Drain Mast

Hot-Selling

loading

Share to:
sharethis sharing button

Chain Type Wick Drain Mast

Soil improvement using Vertical Wick Drain Mast can shorten the path of the pore water in the impermeable soil, accelerate the settlement and reduce the construction period of a project and avoid post-construction differential settlements
  • MPST 32

  • HLS

Availability:
Quantity:

Overview

Soil improvement using Vertical Wick Drain Mast can shorten the path of the pore water in the impermeable soil, accelerate the settlement and reduce the construction period of a project and avoid post-construction differential settlements.




Performance

  • Limited disturbance to the various soil layers

  • Increasing the bearing capacity

  • Economical construction cost

  • Reduce the working time

  • Quick installation on average 15000 m/8h   

  • Installation to depth as great as 55m

  • No waste soil is generated




Advantage

snipaste_20200508_204220

Mast Detail

MPST-22

MPST-32

MPST-42

MPST-55

Material

Leader Steel Type: Q235

Mast Steel Type: Q345

Mast system

Chain

Max mandrel speed/second

1m-2m/Second

Hydraulic motor model detail

Motor model

STAFFA

STAFFA

STAFFA

STAFFA

Rated torque (Kgf. m)

470

975

975

975

Rated pressure (Mpa)

25

25

25

25

Maximum pressure (Mpa)

31.5

31.5

31.5

31.5

Option machine bracket height

<35 m

< 55m

< 55m

< 55m

Wick Drain Mast working speed(m/r)

0.72

0.72

0.72

0.72

Output force

10 Tons

12 Tons

12 Tons

12 Tons

Oil flow in Lit./Min

320 × 2 L/Min

>320 × 2 L/Min

>320 × 2 L/Min

>320 × 2 L/Min

Mandrel Detail

Weight

78.6kg/pcs(3 meters /Section)

Reel specification

Fit for 200m-300m/roll

 

Production capacity of the Wick Drain Mast

10000m-15000m/8h

Option to install or not

 

Jumbo Roll10 Rolls Wick Drain






Previous: 
Next: 

Quick Links

Product

Contact

  8620 61918016
  inquiry@hls-eng.com
  No.506, Building 1, Panshan Chaoneng Pioneer Park, No.900, North Panyu Avenue, Panyu, Guangzhou, Guangdong, China.
Copyright © 2023 Guangdong HLS soft Foundation Engineering Co.,Ltd.  All Right Reserve by HLS.