Article List
- What is Soft & Weak FoundationWhat is Soft & Weak FoundationSoft & Weak foundation refers to the foundation mainly composed of silt, silty soil, alluvial fill, miscellaneous fill or other highly compressible soil layers. This kind of foundation has high water content, low bearing capacity, poor stability, high compressibility, aTechnology August 11, 2020
- Guangdong HLS Civl Engineering Foundation Co.,Ltd.HLS Engineering the Ground Improvement Solution Provider. WE are contributed to provide Design, Construction, Machinery and Material to reinforce the soil.Technology April 30, 2020
- Why have to engage the soft foundation treatment?What is Soft & Weak FoundationSoft & Weak foundation refers to the foundation mainly composed of silt, silty soil, alluvial fill, miscellaneous fill or other highly compressible soil layers. This kind of foundation has high water content, low bearing capacity, poor stability, high compressibility, aTechnology August 11, 2020
- Hazards about without soft foundation treatmentWhat is Soft & Weak FoundationSoft & Weak foundation refers to the foundation mainly composed of silt, silty soil, alluvial fill, miscellaneous fill or other highly compressible soil layers. This kind of foundation has high water content, low bearing capacity, poor stability, high compressibility, aTechnology August 11, 2020
- Soft Foundation treatment method of HLSWhat is Soft & Weak FoundationSoft & Weak foundation refers to the foundation mainly composed of silt, silty soil, alluvial fill, miscellaneous fill or other highly compressible soil layers. This kind of foundation has high water content, low bearing capacity, poor stability, high compressibility, aTechnology August 11, 2020
- SURCHARGE PRELOADING METHODOverview:Surcharge Preloading Method is widely apply in soft soil improvement projects, and the method will be Site Leveling + Sand Layer + PVD Installation + Drainage Channel Excavation. Performance:◎ Increase Bearing Capacity ◎ Increase Soil Consolidation ◎ Reduce different Settlement after DischaTechnology May 27, 2020
- Soft improvement for Zhuhai Huihua Experimental School (Year 2019)Project Background:The project of Zhuhai Huihua Experimental School in Guangdong province is located in Pingsha Town, Gaolan Port Economic Zone, Zhuhai City. The project covers a total area of 32,000 square meters, with a total construction area of 37629 square meters, including 4515 square meters rProject April 29, 2020
- The Package-9 of N-8 Highway Improvement Project In Bangladesh (Year 2018)Project Background:On May 29, 2017, CCECC successfully signed the package 9 of the N8 highway expansion project. The project was obtained through the negotiation of tenders and was the government ’s own funds. The owner was the Bangladesh Army Engineering Office. The main project was the constructioProject April 29, 2020
- Bangladesh Bodu Akali 1320MW Coal-fired Power Plant Project(Year 2020)Project Background:This project is located in Bodu Akali County, Barisal Zone, southern city of Bangladesh, 210 kilometers away from the capital Dhaka and 160 kilometers away from Chittagong. A 2 × 660MW ultra-supercritical coal-fired power generating unit will be built, and the expansion conditionsProject April 29, 2020
- Costa Rica Highway 32 Repair and Expansion Project(Year 2020)Project Background:On November 2nd and 27th, 2017, CCCC-SHEC Third Highway Engineering Co., Ltd received the Phase 1 and Phase 2 bid winning notices for the repair and expansion of Highway 32 in Costa Rica. The two bids were merged into the first branch manager department after a study and decisionProject April 29, 2020